Process

How a project runs

Six stages, in this order, for every job.

  1. 01

    Requirements

    A short written spec: what the unit does, what acts on it, and what it does back.

    You do Show us the problem; mark what is wrong.

    You get A signed spec.

  2. 02

    Quote

    We price the work from the spec. Unknowns are listed as unknowns, with a range.

    You do Check the scope matches what you expected.

    You get A written quote with milestones.

  3. 03

    Design

    The mechanism in 3D with the schematic and PCB alongside it, as one design.

    You do Review the model. Changes are cheapest here.

    You get The 3D model, BOM and a delivery date.

  4. 04

    Build

    Parts made, mechanism assembled, boards brought up, firmware written on the real hardware.

    You do Prepare the site if the unit is installed.

    You get Photos and a short note each week.

  5. 05

    Test

    Every unit tested against the spec: electrical checks, travel, force, end stops, a run-in.

    You do Come to see a test, or send someone.

    You get A test report per serial number.

  6. 06

    Handover

    We install the unit if needed and train the people who will use and maintain it.

    You do Accept it against the spec.

    You get The hardware and every file behind it.

Animation of the workshop floor plan from above: a small unit travels a dashed route through coloured stations, Design, Mechanical, 3D printer, Electronics, Assembly and Test, and each lights up as the unit stops there.
A unit goes round the workshop: modelled, made, brought up, assembled, tested, handed over.

Money and ownership

What you pay for, and what you keep.

Fixed price for fixed scope

A change to the signed spec is priced separately, and we say so before doing the work.

Paid by milestone

Payments are tied to the spec, the approved design and the handover.

Everything is yours

Drawings, CAD, schematics, PCB files, source code, BOM and manual, with nothing kept back.

Tell us what it has to do.

A few lines, a sketch or photos of the equipment are enough to start.