What goes wrong the other way
Take a control lever: a pivot, a spring return, a detent at centre, and a Hall sensor reading a magnet on the pivot. Draw the board first, 60 x 40 mm, sensor in the middle, connector on one edge.
Then the pivot bearing goes where it has to. The magnet ends up 9 mm off the sensor axis, the connector sits under the return spring, and a mounting hole lands inside the detent plunger. None of this shows in the schematic. The board gets drawn again.
What we do instead
We model what moves first: through what angle, against what force. The motor, sensor and magnet go where the motion needs them. Then the parts a hand touches and the things that go through the outside: handle, connectors, display, cable entries.
The board goes in last, as a block in the room that is left. Its outline, holes and connector positions come from the model.
What this catches early
Sensor alignment. A magnetic encoder wants its magnet on axis at a known air gap, often to a fraction of a millimetre. That tolerance is set by the bearing, the shaft and the board mounting together.
Cables that move. Anything that flexes needs a route, a bend radius and a clamp at each end. Without room for that loop, the cable finds its own and breaks there.
Heat. A motor at stall gets hot, and so does its driver. With the mechanism modelled, the driver goes against the frame and the analogue parts stay away from both.
Service. Whether a hand with a spanner can reach the belt tensioner, and whether the connector unplugs without taking the shaft out.
When it doesn’t apply
If the mechanism already exists, as with a replacement unit, it is a constraint and we start by measuring it. If the job really is a board in a wall box, the box comes first. Otherwise the order holds: mechanism, then board, then firmware, with the firmware person in the room from day one.